CR Water Pollution Control Facility
Contract Method
Design Build
Description
Replace 480volt switchgear and controls for Oxygenation process damaged by fire. Maintain limited operation of process throughout project. Upgrade 15KV distribution and paralleling backup generation switchgear.
Acme Team
Don Barrigar